Company >>
Extrusion >>
Coating >>
Anodizing >>
Automation >>
Before the press >>
Press >>
After the press >>
Ovens & furnaces >>
Auxiliary equipment >>
Loading & Unloading >>
Pre-treatment tunnel
Coating equipment >>
Ovens >>
Transportation system
Loading & Unloading
Suction system
Tanks
Robots & transfers
Auxiliary equipment >>
Material flow
GIA Clecim Press
GIA Hidráulica
GIA Aplicaciones
GIA Matricería
GIA Suministros
Log store
Log loading table
Log shear
Aluminium
Other metals
Tooling
Handling equipment >>
Cold cutting saw
Saw gauge & profile stacker
Log heating
Die heating
Nitrocarburation
Ageing
Scrap packing press
Die extraction press
Die assembly bench
Loading system
Unloading system
System of reciprocity
Cyclone & filters
Coating cabin
System of distribution
Drying
Infrared
Curing
Temperature control of tanks
Rectifiers
Regeneration of sulphuric acid
Automatic injection of chemicals
Profile cooling
Saw & Puller
Belt table
Stretcher bench

Home
Contact
Language
Login
Site map

 
Pre-treatment tunnel

Before the coating process, aluminium must undertake a surface treatment in order to assure the adherence of the polymer powder to all the external faces of profiles. This process takes place in the pre-treatment tunnel and is divided by three stages. The stage of grease removal treats the surface of profiles in a way eliminates superficial oil, dirt and even some oxides. The phase of de-oxidation eliminates the alumina layer naturally formed on aluminium surfaces and prepares the surface for the phase of treatment with chromium. During this phase of treatment, a chromium coating is generated on the surface of aluminium; this last phase may be completely omitted if necessary.